Drilling, cementing and hydraulic fracturing in natural gas production

Controlled measurement of fracking pressure

Drilling fluid, or ‘mud’, is used to remove well cuttings, control the formation pressures, maintain wellbore stability and provide cooling and lubrication to the drill bits, throughout the process of drilling a well. Accurate measurement of drilling mud flow is critical to the efficiency of the drilling process, and the measurement must tolerate the density changes of the drilling mud, and occasional voids and gas bubbles. Subsequently, during casing operations, cement is used to fix the steel casing pipes in place, and cement flow and density measurement is essential to control the process. KROHNE OPTIMASS mass flowmeters are typically used for both these measurements, as the straight tube design tolerates the harsh conditions and abrasion produced by the drilling mud and cement flows. They also tolerate the high pressures, measure mass flow despite the fluid density changes, and manage the presence of occasional gas bubbles, using the specially developed Entrained Gas Management (EGM) feature.

Besoins pour ce point de mesure

  • Densité variable du liquide de forage et du ciment avec additifs
  • Produits à mesurer abrasifs
  • Vides et bulles de gaz occasionnels

Besoins pour ce point de mesure

  • Pressions élevées
  • Produit à mesurer abrasif

Besoins pour ce point de mesure

  • Empêcher l'endommagement des paliers de la pompe
  • Indication du débit

Besoins pour ce point de mesure

  • Hautes pressions (>1 000 bar / 15 000 psi)
  • Produit à mesurer abrasif, y compris du sable

Besoins pour ce point de mesure

  • Mesurer le volume dans les réservoirs pendant le pompage
  • Mesurer le volume dans les réservoirs pendant le mélange de produits chimiques et l'hydratation